PMI-SP Test Center Questions : Download 100% Free PMI-SP test Dumps (PDF and VCE)

Exam Number : PMI-SP
Exam Name : PMI Scheduling Professional
Vendor Name : PMI
Update : Click Here to Check Latest Update
Question Bank : Check Questions

PMI-SP Exam Braindumps change on daily basis
If you are looking for PMI PMI-SP test questions to prepare for the PMI Scheduling Professional Exam, killexams.com is the perfect place for you. You can get 100% free PMI-SP demo questions before purchasing the full version of our PMI-SP test practice materials. Our PMI-SP VCE test simulator is the best software to help you prepare for the PMI-SP exam.

Our mission at killexams.com is to provide the best possible resources to help you pass your PMI PMI-SP test on your first attempt. To achieve this goal, we offer our customers real PMI-SP pdf test mock test in two formats: PMI-SP PDF and PMI-SP VCE test system. With these formats, you can breeze through the PMI PMI-SP genuine test rapidly and adequately. Our PMI-SP PDF Questions PDF format is designed for studying on any gadget, including iPhone, iPad, Android, MAC, and more. You can even print it out and take it with you on holiday to the beach or any other location.

We take pride in our high PMI-SP pass rate, which is at 98.9%. Furthermore, the comparability rate between our PMI-SP PDF Braindumps and the genuine test is also at 98%. This means that you can rely on our materials to provide you with accurate and up-to-date information that will prepare you for the real exam. If you want to achieve success in the PMI-SP test in just one attempt, then look no further than killexams.com. We are confident that our resources will help you pass your test with flying colors.







PMI-SP test Format | PMI-SP Course Contents | PMI-SP Course Outline | PMI-SP test Syllabus | PMI-SP test Objectives


The Project Management Institute (PMI) ® offers a professional credential for project schedulers, known as the PMI Scheduling Professional (PMI-SP)®. PMIs professional credentialing examination development processes stand apart from other project management certification examination development practices. PMI aligns its process with certification industry best practices, such as those found in the Standards for Educational and Psychological Testing.



Although many of the domains, tasks, knowledge, and skills outlined by the PMI-SP test Content Outline are also covered by the Practice Standard for Scheduling and PMBOK® Guide, there are some that are unique to the PMI-SP test Content Outline. Candidates studying for the examination will certainly want to include the current edition of the Practice Standard for Scheduling and PMBOK® Guide as two of their references, and would be well advised to read other current titles on project scheduling.



Schedule Strategy 14%

Schedule Planning and Development 31%

Schedule Monitoring and Controlling 35%

Schedule Closeout 6%

Stakeholder Communications Management 14%

Total 100%



Domain 1: Schedule Strategy (14% of examination)


Task 1 Establish project schedule configuration management policies and
procedures incorporating best practices, regulations, governing standards
and organization policies, and procedures to ensure accessibility, storage,
retrieval, maintenance, change control, and baseline schedule control.


Task 2 Develop schedule approach, based on the unique characteristics of the
project, including enterprise environmental factors and organizational
process assets, in order to define schedule requirements.


Task 3 Establish scheduling policies and procedures regarding methodology,
selection of a scheduling tool, scheduling parameters, performance
thresholds, activity granularity, presentation format, earned value
management (EVM) implementation, analysis techniques, and approval
requirements by using resources such as organizational process assets and
project documents in order to develop the schedule management plan and
standardize operational procedures.


Task 4 Develop the scheduling-related components for project management plans
(for example, integration, scope, cost, quality, resources, communication,
risk, and procurement management), through review of contract
requirements, in order to integrate scheduling activities into the overall
project management process.


Task 5 Provide information about project scheduling objectives and goals, the role of
the scheduler, and scheduling procedures to project team members to
facilitate effective participation in the project.

Knowledge and Skills:

 Applicable contract requirements, regulations, and governing standards

 Schedule control processes (for example, baseline control, status update procedure, variance thresholds)

 Scheduling development concepts (for examples, coding, work breakdown structures, organizational breakdown structure, resource breakdown structures)

 Project charter



Domain 2: Schedule Planning and Development (31% of examination)


Task 1 Develop the work breakdown structure (WBS), organizational breakdown
structure (OBS), control accounts (CA), and work packages through
communication with subject matter experts and stakeholders and analysis of
the contractual commitments in order to ensure completion of the project
scope.


Task 2 Define activities and milestones through communication with subject matter
experts, decomposition, and application of scheduling policies and
procedures to identify and document the work to be performed.


Task 3 Estimate activity durations, utilizing subject matter experts and scheduling
techniques such as three-point estimate, parametric, analogous and/or
Program Evaluation and Review Technique (PERT) in order to develop an
overall schedule model.


Task 4 Sequence activities, incorporating defined dependencies (internal, external,
and cross programs) milestones, and constraints (for example, calendars,
geography, contracts), in order to develop a logical, dynamic schedule model.


Task 5 Identify critical and near-critical path(s) using techniques such as Critical
Path Method, Critical Chain, Program Evaluation and Review Technique
(PERT), and Monte Carlo simulation in order to meet project delivery date
requirements.


Task 6 Develop the project resource breakdown structure (RBS), determine resource
availability, and assign resources to activities by working with functional
managers, project managers, and project team members in order to define the
resource constrained schedule.


Task 7 Adjust schedule model based upon resource availability, available budget,
and other known constraints in order to calculate the resource constrained
schedule.


Task 8 Align schedule with the overall program plan or integrated master plan (IMP),
through review of enterprise objectives and contract documentation, in order
to ensure accomplishment of overall program objectives.


Task 9 Analyze major milestones against statement of work (SOW), the contract,
and/or memorandum of understanding, to assess whether schedule model
delivery estimates meet required deadlines.


Task 10 Perform schedule risk analysis using quantitative tools or techniques (for
example, what-if scenarios, Monte Carlo simulation) in order to determine if
project milestone dates are achievable within acceptable risk tolerances.


Task 11 Obtain a consensus of the project customer, sponsor, project manager, and
project team members, in order to establish an approved baseline schedule.


Task 12 Establish the Performance Measurement Baseline (PMB), using organizational
processes and standard techniques, in order to enable performance measurement and management.


Knowledge and Skills:

 Scope statements, including deliverables and deadlines

 Work breakdown structure (WBS)

 Organizational breakdown structure (OBS)

 Resource breakdown structure (RBS)

 Cost structure as related to schedule development

 Activity definition

 Activity execution techniques (duration/time, effort/work)

 Dependency relationship types (Finish to Start, Start to Finish, Finish to Finish, Start to Start)

 Leads and lags

 Prioritization within the schedule model

 Resource groups

 Resource calendars

 Resource allocation techniques

 Activity Network Diagram (AND)

 Precedence Diagramming Method (PDM)

 Capacity requirements/resource requirements

 Contingency reserve or buffer (funds, budget, or time)

 Cost and schedule integration

 Schedule baselining

 Performance Measurement Baseline (PMB)

 Inter-project Dependencies

 Milestone definition

 Schedule model components

 Schedule risk-assessment techniques (for example, Monte Carlo simulation, PERT)



Domain 3: Schedule Monitoring and Controlling (35% of examination)


Task 1 Collect activity status at defined intervals from activity owners via reports,
meetings, inspections, or other standard procedures in order to update and
review the project progress.


Task 2 Collect resource information and updates via reports, timesheets, meetings,
inspections, or other standard procedures in order to report on resource
utilization and availability.


Task 3 Perform schedule analysis and audit, on in-house and subcontractor
schedules, using industry standards, guidelines and best practices in order to
identify and report project schedule, status, changes, impacts or issues.


Task 4 Identify alternative project execution options, using tools and techniques
such as what-if scenario analyses, in order to optimize the schedule.


Task 5 Incorporate approved risk mitigation activities into the schedule, by utilizing
defined change control processes, in order to establish a new performance
measurement baseline (PMB).


Task 6 Update the schedule model and document schedule baseline changes,
received through formal change-control processes, in order to maintain an
accurate schedule and facilitate forensic schedule analysis, if required.


Knowledge and Skills:

 Progress measurement techniques (for example, percent complete, actual/remaining duration, estimate to complete)

 Industry standards, guidelines, and best practices with respect to activity status update frequency, format, and content

 Metrics to monitor, analyze, and control the schedule

 Cost and schedule reserve analysis

 Activity prioritization

 Available data, logical data organization/relationships within data elements

 Electronic file storage and retrieval standards

 Resource breakdown structure (RBS)

 Resource calendars

 Resource groups

Resource allocation techniques

 Schedule risk analysis

 Project schedule change control

 Reserve analysis

 Knowledge of ongoing audit analysis

 Activity Network Diagram (AND)

 Precedence Diagramming Method (PDM)

 Schedule risk test techniques (for example, Monte Carlo simulation, Program and Evaluation Review Technique [PERT])
Schedule and cost variance management



Domain 4: Schedule Closeout (6% of examination)


Task 1 Obtain final acceptance of the contractual schedule components, by working
with sponsor and/or customer, in order to facilitate project closeout.


Task 2 Evaluate final schedule performance against baseline schedule, scheduling
approach and the implementation, using standard scheduling tools and
techniques, including solicitation of feedback from stakeholders, in order to
identify lessons learned and develop best practices.


Task 3 Update the organizational process assets, through documentation of
identified lessons learned and best practices, in order to Excellerate business
processes.


Task 4 Distribute final schedule reports, including earned value management (EVM)
calculations and variance analysis, to stakeholders in order to facilitate
project closeout.


Task 5 Archive schedule files (for example, final schedule model, schedule
management plan, periodic status reports, schedule change log), as per
defined procedures in order to satisfy contractual requirements and prepare
for potential forensic schedule analysis.


Knowledge and Skills:

 Contractual schedule components

 Schedule close-out procedures

 Feedback techniques

 Schedule review techniques

 Schedule issue management

 Transition planning



Domain 5: Stakeholder Communications Management (14% of examination)


Task 1 Develop and foster relationships with project stakeholders, consistent with
the communication management plan, in order to enhance support for the
project schedule.


Task 2 Generate and maintain visibility of project schedule, by working with the
project manager and/or stakeholders, in order to maintain stakeholder
support.


Task 3 Provide senior management and other stakeholders with verbal and written
schedule status updates and impact on schedule of corrective actions, as
defined by the communication management plan, in order to maintain
stakeholder awareness.


Task 4 Communicate schedule issues that could impact delivery of project scope or
adherence to the schedule management plan, in order to elevate awareness to
relevant stakeholders.


Knowledge and Skills:

 Targeting communications to senior management

 Methods and techniques used to maintain visibility of project schedule Elements of the communication management plan Oral and written communication tools and techniques

 Targeting communications to intended audience

 Presentation tools and techniques

 Negotiation

 Facilitation

 Cultural sensitivity and diversity

 Conflict resolution

 Project life cycle

 Stakeholder-impact analysis

 Change management/control

 Scheduling terminology

 Organizational process assets

 Project management software

 Project management information systems

 Schedule documentation and reporting techniques

 Scheduling data management procedures (for example, archiving, storage, retrieval)

 Estimation techniques (for example, analogy based estimation, parametric estimation, historical data, expert estimation)

 Scheduling methods (for example, critical path method, critical chain, linear, agile)

 Scheduling techniques (for example, resource leveling, schedule compression, simulation)

 Earned Value Management (EVM)

 Gantt Charts

 Quantitative and qualitative schedule analysis (for example, schedule performance index, baseline execution index, float analysis)

 Problem-solving tools and techniques

 Contract schedule requirements



Killexams Review | Reputation | Testimonials | Feedback


Most updated dumps are provided for PMI-SP exam.
I recently took the PMI-SP test and passed it with flying colors, thanks to the incredible study material provided by killexams.com. Their braindumps are reliable and effective, and I am glad I chose them as my study partner. The material not only helped me pass the exam, but it also allowed me to test my knowledge and identify areas where I needed to improve.


Get cost percent information to read PMI-SP exam.
Thanks to a great companion of mine who recommended killexams.com questions and answers, I was able to score 88% on my PMI-SP exam. All the material provided was wonderful, and although getting enlisted for the test was simple, the real test proved to be quite challenging. However, with the help of killexams.com, I was able to pass with ease and continue with my career.


Preparing PMI-SP test is matter of some hours now.
It is difficult to find test material that covers all the necessary skills required to take the PMI-SP exam. However, I was fortunate enough to use the killexams.com material which had all the required information and capabilities. The PMI-SP braindumps were also very useful and provided comprehensive subjects in a seamless manner, making it easy for me to train and analyze every problem. I highly recommend this material to my friends.


Do no longer waste some time on looking, just get these PMI-SP Questions from real study.
After consecutive failures in the PMI-SP exam, I was devastated and considered changing my subject, thinking that it was not my cup of tea. However, someone suggested I try one last time with killexams.com, and I am glad I did. The last attempt was a success, and I passed the paper with killexams.com's help, which put in all the effort to make things work for me, allowing me to pursue my discipline.


These PMI-SP Latest dumps works great in the real exam.
I am Aggarwal, and I work for Clever Corp. I was thinking about the PMI-SP test because it contained hard case memorization. I implemented killexams.com questions and answers, and my many doubts got cleared because of the explanations provided for the answers. I also received well-solved case memorization in my email. I am happy to mention that I got 73% in the exam, and I credit killexams.com for helping me succeed.


PMI Scheduling tricks

http://www.pass4surez.com/art/read.php?keyword=PMI+Scheduling+tricks
https://www.pass4surez.com/art/read.php?keyword=PMI+Scheduling+tricks&lang=us&links=remove



While it is hard job to pick solid certification questions/answers regarding review, reputation and validity since individuals get sham because of picking incorrec service. Killexams.com ensure to serve its customers best to its efforts as for test dumps update and validity. Most of other's post false reports with objections about us for the brain dumps bout our customers pass their exams cheerfully and effortlessly. We never bargain on our review, reputation and quality because killexams review, killexams reputation and killexams customer certainty is imperative to us. Extraordinarily we deal with false killexams.com review, killexams.com reputation, killexams.com scam reports. killexams.com trust, killexams.com validity, killexams.com report and killexams.com that are posted by genuine customers is helpful to others. If you see any false report posted by our opponents with the name killexams scam report on web, killexams.com score reports, killexams.com reviews, killexams.com protestation or something like this, simply remember there are constantly terrible individuals harming reputation of good administrations because of their advantages. Most clients that pass their exams utilizing killexams.com brain dumps, killexams PDF questions, killexams practice questions, killexams test VCE simulator. Visit our example questions and test brain dumps, our test simulator and you will realize that killexams.com is the best test dumps site.

Which is the best dumps website?
You bet, Killexams is hundred percent legit and also fully well-performing. There are several benefits that makes killexams.com traditional and genuine. It provides informed and hundred percent valid test dumps including real exams questions and answers. Price is surprisingly low as compared to a lot of the services online. The mock test are current on usual basis through most exact brain dumps. Killexams account arrangement and product delivery is extremely fast. Data file downloading is certainly unlimited and incredibly fast. Aid is avaiable via Livechat and Electronic mail. These are the features that makes killexams.com a strong website offering test dumps with real exams questions.



Is killexams.com test material dependable?
There are several mock test provider in the market claiming that they provide real test Questions, Braindumps, Practice Tests, Study Guides, cheat sheet and many other names, but most of them are re-sellers that do not update their contents frequently. Killexams.com is best website of Year 2024 that understands the issue candidates face when they spend their time studying obsolete contents taken from free pdf get sites or reseller sites. Thats why killexams.com update test mock test with the same frequency as they are updated in Real Test. test dumps provided by killexams.com are Reliable, Up-to-date and validated by Certified Professionals. They maintain dumps collection of valid Questions that is kept up-to-date by checking update on daily basis.

If you want to Pass your test Fast with improvement in your knowledge about latest course contents and subjects of new syllabus, We recommend to get PDF test Questions from killexams.com and get ready for real exam. When you feel that you should register for Premium Version, Just choose visit killexams.com and register, you will receive your Username/Password in your Email within 5 to 10 minutes. All the future updates and changes in mock test will be provided in your get Account. You can get Premium test Dumps files as many times as you want, There is no limit.

Killexams.com has provided VCE practice test Software to Practice your test by Taking Test Frequently. It asks the Real test Questions and Marks Your Progress. You can take test as many times as you want. There is no limit. It will make your test prep very fast and effective. When you start getting 100% Marks with complete Pool of Questions, you will be ready to take real Test. Go register for Test in Test Center and Enjoy your Success.




DES-9131 braindumps | ACP-100 Study Guide | MLS-C01 free pdf get | HPE6-A47 cheat sheets | NSE7_LED-7.0 free pdf | QQ0-401 test prep | SDM-2002001040 free practice tests | GERO-BC online test | MS-203 online test | E20-526 pass test | S1000-009 study guide | Wonderlic free prep | 101-01 cheat sheet | BPM-001 practice test | 3X0-103 practical test | NNAAP-ALNA practice test | C1000-065 test prep | OG0-091 dumps questions | ACP-600 PDF get | NAWCO-OMS test preparation |


PMI-SP - PMI Scheduling Professional braindumps
PMI-SP - PMI Scheduling Professional PDF Questions
PMI-SP - PMI Scheduling Professional Practice Test
PMI-SP - PMI Scheduling Professional information hunger
PMI-SP - PMI Scheduling Professional syllabus
PMI-SP - PMI Scheduling Professional Study Guide
PMI-SP - PMI Scheduling Professional test prep
PMI-SP - PMI Scheduling Professional test format
PMI-SP - PMI Scheduling Professional Latest Questions
PMI-SP - PMI Scheduling Professional syllabus
PMI-SP - PMI Scheduling Professional cheat sheet
PMI-SP - PMI Scheduling Professional test contents
PMI-SP - PMI Scheduling Professional PDF Download
PMI-SP - PMI Scheduling Professional real Questions
PMI-SP - PMI Scheduling Professional information source
PMI-SP - PMI Scheduling Professional Cheatsheet
PMI-SP - PMI Scheduling Professional guide
PMI-SP - PMI Scheduling Professional Dumps
PMI-SP - PMI Scheduling Professional braindumps
PMI-SP - PMI Scheduling Professional Practice Questions
PMI-SP - PMI Scheduling Professional test
PMI-SP - PMI Scheduling Professional teaching
PMI-SP - PMI Scheduling Professional Dumps
PMI-SP - PMI Scheduling Professional dumps
PMI-SP - PMI Scheduling Professional test syllabus
PMI-SP - PMI Scheduling Professional Questions and Answers
PMI-SP - PMI Scheduling Professional real questions
PMI-SP - PMI Scheduling Professional information source
PMI-SP - PMI Scheduling Professional test Questions
PMI-SP - PMI Scheduling Professional book
PMI-SP - PMI Scheduling Professional Practice Questions
PMI-SP - PMI Scheduling Professional test
PMI-SP - PMI Scheduling Professional Free test PDF
PMI-SP - PMI Scheduling Professional learn
PMI-SP - PMI Scheduling Professional PDF Dumps
PMI-SP - PMI Scheduling Professional answers
PMI-SP - PMI Scheduling Professional Real test Questions
PMI-SP - PMI Scheduling Professional test Questions
PMI-SP - PMI Scheduling Professional Real test Questions
PMI-SP - PMI Scheduling Professional study help
PMI-SP - PMI Scheduling Professional information hunger
PMI-SP - PMI Scheduling Professional test prep
PMI-SP - PMI Scheduling Professional test Questions
PMI-SP - PMI Scheduling Professional test Questions

Other PMI test Dumps


PMI-100 online exam | PgMP question test | PMI-RMP certification sample | PMP-2024 test prep | PMI-PBA Questions and Answers | CAPM study guide | PPM-001 assessment test sample | PMI-200 questions download | PMP english test questions | PMI-ACP real questions | CCE-CCC cbt | PMI-SP test Questions | PfMP free pdf |


Best test Dumps You Ever Experienced


CRCM practice questions | SCNS-EN practice test | 050-v71-CASECURID02 real Questions | 1T6-521 brain dumps | GE0-803 Cheatsheet | 5V0-23.20 study guide | Okta-Certified-Consultant certification sample | 3V0-41.22 english test questions | ITEC-Massage test questions | LE0-583 test prep | 1Y0-231 Practice Questions | CRFA examcollection | Salesforce-Advanced-Cross-Channel test questions | ADM-211 PDF Download | C1000-132 assessment test sample | CCE-CCC study material | SVC-19A test practice | QSSA2023 training material | 250-428 test questions | HPE0-V26 Study Guide |





References :


http://killexams-braindumps.blogspot.com/2020/06/exam-pmi-sp-questions-and-answers-are.html
https://killexams-posting.dropmark.com/817438/23543698
https://www.instapaper.com/read/1323672171
https://www.blogger.com/comment.g?blogID=9877556&postID=112225920042319861&page=1&token=1595292508273
http://feeds.feedburner.com/SimplyContemplateThesePmiPmi-spQuestionsAndPassTheRealTest
https://sites.google.com/view/killexams-pmi-sp-exam-question
https://youtu.be/C6z4SA6bKUg
https://files.fm/f/acpa3pbxn



Similar Websites :
Pass4sure Certification test dumps
Pass4Sure test Questions and Dumps




Back to Main Page


PMI-SP Practice Test direct download
© ARM Seguros- 2017                                                                                                                                                                 Planificando el presente, aseguramos el futuro.

100% Guaranteed PMI-SP Practice Tests | Killexams

100% guaranteed PMI-SP Practice Tests with Actual Questions to pass PMI Scheduling Professional exam. Complete pool of PMI-SP question with 100% money back guarantee are provided.

Educación

¿Qué es un Seguro Educativo? La Comisión Nacional para la Protección y Defensa de los Usuarios de Servicios Financieros (Condusef) define al seguro educativo como un instrumento financiero, de supervivencia del menor, en el que durante determinado tiempo el padre, madre o tutor paga una prima (cantidad mensual, trimestral, semestral o anual) y el beneficiario recibirá al cumplir 15, 18 o 22 años, una suma asegurada para continuar sus estudios.

Seguro Educativo

Es un plan a través del cual garantiza un capital que ayudará a pagar la educación universitaria o de posgrado de sus hijos además de brindarle protección por Fallecimiento o Invalidez. Puede asegurar a otra persona que tenga como interés común la educación del menor asegurado mediante la opción mancomunada. Tiene la opción de elegir la edad en la que el menor recibir el beneficio, ya sea a los 18 - 22 años además del tipo de moneda a contratar: nacional, dólares americanos o udis, entre otros beneficios. Contiene básicamente tres componentes: Ahorro. Son las aportaciones periódicas denominadas primas para alcanzar la suma asegurada. Seguro. Cubre el riesgo contra invalidez o fallecimiento de los padres o tutores, el cual podría afectar el cumplimiento de la meta. Inversión. El ahorro acumulado crece con el tiempo para que no

ARM Seguros 5 B Sur 5506 P.B. Col. Villa Encantada, Puebla, Puebla. 

Tel (222) 888.4665, (222) 888-4560, 01 (800) 286-8192   Cel.  (222)  128-6689

© ARM Seguros 2017

Educación

¿Qué es un Seguro Educativo? La Comisión Nacional para la Protección y Defensa de los Usuarios de Servicios Financieros (Condusef) define al seguro educativo como un instrumento financiero, de supervivencia del menor, en el que durante determinado tiempo el padre, madre o tutor paga una prima (cantidad mensual, trimestral, semestral o anual) y el beneficiario recibirá al cumplir 15, 18 o 22 años, una suma asegurada para continuar sus estudios.

Seguro Educativo

Es un plan a través del cual garantiza un capital que ayudará a pagar la educación universitaria o de posgrado de sus hijos además de brindarle protección por Fallecimiento o Invalidez. Puede asegurar a otra persona que tenga como interés común la educación del menor asegurado mediante la opción mancomunada. Tiene la opción de elegir la edad en la que el menor recibir el beneficio, ya sea a los 18 - 22 años además del tipo de moneda a contratar: nacional, dólares americanos o udis, entre otros beneficios. Contiene básicamente tres componentes: Ahorro. Son las aportaciones periódicas denominadas primas para alcanzar la suma asegurada. Seguro. Cubre el riesgo contra invalidez o fallecimiento de los padres o tutores, el cual podría afectar el cumplimiento de la meta. Inversión. El ahorro acumulado crece con el tiempo para que no pierda su poder adquisitivo